Client: Saudi Electricity Company (SEC)
Scope: Structural assessment of PP9 transport route for moving a 178ton burned transformer, including vehicular bridge and firewater trench crossing.
Approach: Review of drawings and lifting plans, SAP2000 bridge modeling, manual trench calculations, and evaluation of SPMT (6, 10, 12axle) load effects.
Deliverables: Structural adequacy checks, SAP2000 analysis results, trench capacity assessment, and safepassage recommendations for each SPMT configuration.
Client Value: Ensured safe transformer transport, minimized risk of structural failure, avoided operational disruptions, and provided feasible alternatives for bridge/trench crossing.