Our Projects

Your trusted partner in providing innovative engineering solutions for the energy sector since 2005

PP9 Burnt Transformer Transportation to SS#9046

About the Specialization

Client: Saudi Electricity Company (SEC) 
Scope: Structural assessment of PP9 transport route for moving a 178ton burned transformer, including vehicular bridge and firewater trench crossing.  
Approach: Review of drawings and lifting plans, SAP2000 bridge modeling, manual trench calculations, and evaluation of SPMT (6, 10, 12axle) load effects.  
Deliverables: Structural adequacy checks, SAP2000 analysis results, trench capacity assessment, and safepassage recommendations for each SPMT configuration.  
Client Value: Ensured safe transformer transport, minimized risk of structural failure, avoided operational disruptions, and provided feasible alternatives for bridge/trench crossing. 

You can search for what you want

You can search for what you want